SEED Materials

Technical guide / Concrete production

Aggregate moisture correction: a worked batch calculation

Follow one sand fraction from oven-dry mass to SSD design mass and wet batch mass, then correct the water addition.

The idea, illustrated

Follow the sand. Balance the water.

  1. 01707 kg SSDDesign mass includes 7 kg absorbed water
  2. 02700 kg oven-dry707 ÷ 1.01 establishes aggregate solids
  3. 03735 kg wet700 × 1.05 includes 35 kg total water
28 kgFree water: 35 − 7
152 kgWater to add: 180 − 28
0.45Effective water / binder: 180 / 400
One fraction, illustrative values. Absorption 1% and total moisture 5% both use oven-dry mass. All other water contributions are assumed already accounted for or zero.

Sand moisture correction

Change sand moisture to see how much wet sand and added water the batch needs.

Adjust the inputs

Results update as you change a value.

Wet sand to batch
735.00 kg
Water to add
152.00 kg
Target water 180.00 kg−Free water in sand28.00 kg=Water to add152.00 kg

The sand supplies 28 kg of the target water.

One sand fraction. Other water contributions assumed accounted for.

Identify the mass basis first

Aggregate can be described on an oven-dry basis, a saturated surface-dry basis or an as-batched wet basis. SSD represents pores filled with water but no free surface water. A mixture schedule based on SSD masses cannot simply be entered as wet stockpile masses without checking the moisture condition. NRMCA TIP 6 explains these distinctions and the corresponding adjustments. [source]

For this example, both absorption and total moisture are percentages of oven-dry mass. Using a wet-mass moisture percentage in the same equations would be incorrect. Write the basis beside the percentage in every worksheet.

The figures below represent one illustrative sand fraction. They do not describe SEED's current sand, a recommended mix or an approved production batch.

Convert SSD sand into the required wet mass

Assume the design calls for 707 kg of SSD sand. Laboratory absorption is 1.0% and the measured total moisture at batching is 5.0%, both on an oven-dry basis.

Oven-dry mass = 707 ÷ (1 + 0.01) = 700 kg

The required aggregate solids are therefore 700 kg. At 5.0% total moisture, the wet batch mass is 700 × 1.05 = 735 kg. This maintains the intended aggregate solids while accounting for water carried in the stockpile material.

As a cross-check, the SSD mass contains 7 kg of absorbed water, while the wet mass contains 35 kg of total water. The difference is 28 kg of free water above the SSD condition.

Deduct the free water from the addition

Suppose the mixture requires 180 kg of effective mixing water. In this simplified example, only the sand contributes free water; every other relevant contribution is assumed already accounted for or zero.

Free water = 700 × (0.05 − 0.01) = 28 kg
Water to add = 180 − 28 = 152 kg

The correct pair is therefore 735 kg of wet sand plus 152 kg of added water. Changing only one setting leaves the mass balance inconsistent. ACI also distinguishes moisture-adjusted batch weights from the uncorrected schedule. [source]

For actual batching, repeat the calculation for each aggregate fraction. Include other water contributions as required by the adopted procedure, including relevant admixture water, recycled water and any water already in the mixer. A single sand correction is not the complete water ledger.

See what an omitted correction changes

With 400 kg of cementitious material, the intended ratio is 180 ÷ 400 = 0.45. Now consider a specific mistake: the operator correctly batches 735 kg of wet sand but still adds the full 180 kg of water. The sand contributes another 28 kg, making effective water 208 kg and the ratio 208 ÷ 400 = 0.52.

This comparison assumes the corrected wet aggregate mass is used in both cases. If the aggregate mass is also wrong, the arithmetic and yield change again. The ratio calculation does not predict a particular strength loss; that relationship depends on the mixture and evidence.

If measured total moisture is below absorption, the simple correction changes sign. The actual approach should also account for the material's absorption behaviour and the approved mixing procedure. Do not assume all aggregates reach equilibrium instantaneously.

Turn the calculation into a repeatable control

  • Sample representative material and record the fraction, stockpile location and time.
  • Confirm the test or sensor reading and the percentage basis.
  • Calculate both the wet aggregate mass and the water adjustment.
  • Have the revised batch settings checked against the approved mix revision.
  • Keep the reading and correction with the batch record.

Agree monitoring frequency against stockpile conditions, weather and production variability. Rain, drainage and a newly exposed stockpile face can change conditions. A moisture sensor still needs verification and maintenance; a plausible display is not proof of accuracy.

Use a protected worksheet with named inputs and units, then independently check the first calculation. The useful output is a traceable correction that another operator can reproduce.

Sources & scope

Primary references consulted for this guide. Worked examples are illustrative. Apply the project specification and the appropriate adopted test methods.

  1. NRMCA TIP 6 · Aggregate moisture and mixture adjustments

    Oven-dry, SSD and wet mass bases; free water correction.

  2. ACI · Corrected and uncorrected batch weights

    Moisture-adjusted production masses.