Start with the wall requirement
The first question is what the wall has to do. Record whether it is an internal partition or an external infill, its height and length, its support, its exposure and the finishes on each face. Define required fire, thermal or acoustic performance for the actual assembly. A material label is not a substitute for that brief.
For SEED's published CELBLOC range, the application is non-load-bearing walls and partitions above plinth, subject to the project design. Its two lengths and three widths help with layout; they do not by themselves establish a strength grade. [source]
Understand the production routes
Preformed-foam CLC introduces a controlled foam into a cementitious mixture. AAC is factory-made aerated concrete cured in an autoclave. Fired clay brick follows a different material and manufacturing route again. These distinctions affect which product documentation and installation instructions you should request. [source] [source] [source]
Do not copy a thermal value, adhesive specification or fire rating from an AAC brochure into a CLC submission. Likewise, “brick” is too broad a comparison unless the proposed brick and wall thickness are identified. Keep each offer tied to its own manufacturer, dimensions and evidence.
Build a comparison that can be checked
| Question | Record for every proposed wall |
|---|---|
| Which product? | Supplier, product, grade, dimensions and tolerances. |
| Which weight? | Density basis and moisture condition; unit and completed wall mass. |
| Which performance? | Test method, specimen or assembly, thickness and report applicability. |
| Which interfaces? | Support, restraint, openings, movement, services and finishes. |
| Which commercial scope? | Delivery, unloading, jointing, labour, cuts, finishes and programme. |
This schedule is a procurement tool, not a scorecard with a predetermined winner. A missing test report should remain an unresolved item until the proposed requirement can be substantiated.
Compare cost per finished square metre
A lower price per unit can still produce a more expensive wall. Calculate units per net wall area, then include jointing material, handling, cutting, labour and the specified finish. Keep taxes and transport on the same basis when comparing quotations.
As a dimension-only example, a 600 × 200 mm face gives 0.12 m² before joints; a 450 × 200 mm face gives 0.09 m². Those imply different unit counts for the same wall. They do not imply the same unit price, handling effort or installed cost. Use the quantity guide to make the take-off explicit.
Where a lighter proposed wall changes the design load, give the actual wall build-up to the structural designer. Savings in foundations or frame members should come from a revised design, not a blanket marketing percentage.
Resolve the decision with a sample detail
For a meaningful project comparison, select one representative wall: include an opening, a frame junction and the intended finish. Ask each bidder to identify the product, proposed installation system and the evidence supporting the required performance. A sample panel can then be inspected against agreed workmanship and finish criteria.
- Are the test results for the same product and thickness being offered?
- Are supports and movement details shown rather than left to the mason?
- Can the supplier meet the delivery sequence and agreed grade?
- Does the quotation include the complete wall scope?
The output should be a documented choice for that application. A product suitable for a partition is not automatically suitable for a structural wall, ground-contact use or a different exposure.
Sources & scope
Primary references consulted for this guide. Worked examples are illustrative. Apply the project specification and the appropriate adopted test methods.
- SEED Materials · CELBLOC technical datasheet R03, 25 October 2026
Approved dimensions, application limits and archived installation guidance; archive revision dates unconfirmed.
- RISE · Cellular lightweight concrete
Material production and characterisation; no RISE values are adopted as CELBLOC ratings.
- Australian Government YourHome · Autoclaved aerated concrete
AAC production and system detailing. Australian provisions are not presented as Pakistan project requirements.
- Australian Government YourHome · Brickwork and blockwork
Different masonry products and wall systems.